Nightmare with Advantage Flooring - AdvantageFloor.com - Jay Behl

NIGHTMARE EXPERIENCE WITH ADVANTAGEFLOOR.COM (Advantage Flooring)
Here is our most recent communication to try to solve the issue we had - You will understand when reading this letter. All was posted in a complaint on the BBB.

November 30th 2020

Mr. Jay Behl,

Owner, Advantage Flooring
416 Fireweed Trail
Ottawa ON K1V 2K4
(613) 902-1055

 Subject:  Request for reimbursement and damages compensation - Contract – Quote QU-0437

Mr. Behl, 

We are in a situation where you did delegate a mandate to a project manager (apparently new to your staff) who hired a worker also new. As early as the beginning of the second day of work, it was obvious that the project manager did not understand the main reason for the project (soundproofing). From there I made several requests to have you on site to solve the issues we had. You refused to take your responsibilities and never showed up, making it conditional to receiving a second 1/3 instalment payment (I repeat, after only one day of valuable work (no mention of a second instalment it in the contract).

We had a few exchanges on the BBB web site, so I am starting from the statement your project manager Allan Orazuk wrote, and I will prove that 1) He lied, and 2) He does not seem to be competent for this type of work. For those reasons, I consider you failed in fulfilling your part of the contract, therefore I am asking for a refund and damages compensation.

Besides numerous inexactitudes (to put it this way) written in the Project manager’s response to the BBB, we will address two main issues plus a 3rd comment on finances followed by a final proposition:

1 – Notes to the BBB by the Project manager – SUB-FLOOR STRUCTURAL OR NOT?

 “Upon removing the sub-floor it had come to Danny's attention that the sub-floor was actually barn boards approximately 12" wide and in thickness varying between 1 3/4" to 2 1/2". 

“I then took this information and my on-site pictures and reached out to my engineer George at Lampkin Structural Services for a professional opinion he advised me that in his opinion these boards are structural and they cannot be removed without a site visit ($500) and a spec from the engineer.”

George was traced down, he works now for another firm: Gaston engineering (the only George there). He never received pictures from Allan, he just gave a generic opinion based on what Allan said. Allan never took a close look at those boards. Half the floor was already covered with plywood when he accepted to come on site. He could not notice that some were loose, and none in the open space were touching any structures on both ends. If the project manager persists in his lie, we will ask a copy of the email or messages sent to George and containing the pictures (I talked to George myself). It is not the first time the manager lied. The worker told me directly he quit after the second day. Allan told me he was sick and be there the next day. The next day, the worker came only to get his tools, he did quit (but was ready to work directly for me – maybe another proof that the manager lied again when he wrote the worker quit because of me being difficult).                               

This is not a professional behavior doubled with lies. After the first day we should have stopped the work, have an engineer in (could have being almost right away – extra costs involved was not a problem – it was mentioned in the contract), then develop a good strategy/work around if needed, to do the job safely for the house. Instead, Allan refused and dismissed the idea to take the older floor out. Does all this make the project manager professional and credible? No.

2 – Notes to the BBB from the Project manager – HOW TU BUILD A SUB-FLOOR

“I then cancel my afternoon appointments and meet Danny and Serge on site reviewing the floor with a laser level I was able to show Serge the floor would be rising 2.25" approximately using all of the materials as per quote and another layer of 3/8 sub floor free of cost as well as sleeper joists on 12" centers.”

Is it good practice not to follow the Ontario Building Code - using a 3/8 inch sub floor? Link to the code: http://www.buildingcode.online/1877.html

It says there that it should never be less than ½ inch. (12,* cm). Most builders use 5/8.
Yes I lost my temper a few times, in this case I realized that that the project manager did not even plan to put plywood on top of the sleeper joists (in his mind the Sonopan and cork panels would act as structural subfloor – they are both breakable by hands!). After I got mad (he decided to add 3/8 obs to support the flooring – free, to calm me down). This would not have helped at all.

3 – Notes to the BBB from the Project manager – FINANCES

 “We are out in supplies and labour over $2500 pls hst on the project as it stands. ”

The first day of work – the only valuable one for me – only used labor and tools plus some fees to get rid of the ripped old floor (as per the quote $100). The worker (who offered to work for me directly after he quit the company) told me he was paid $250/day.

The second day of work – a lost. I will need to pay somebody to undo the job done: One day of work. It has to be undone to start where we were after the first day of work - after we will get an assessment from a structural engineer.


Material left in my house, Jay (the owner) got a photo. I offered to pay at cost plus taxes
Sonopan panels (8), 2 tubes of glue, 2 boxes of screws, 2 packs of R22 and a few other things.
 

In conclusion, I think I made my point: too much incompetency – lost of trust

In addition to this incompetency, at each tension point described above, and I repeat: I asked the owner (Jay Behl) to come on site, he would not respond then put it conditional to receiving a second installment of another third – this after only one day of valuable work done – no material used, only tools. (On the official Ontario Consumer Site, they say: Never give more than 10% down). Is this a responsible business owner, a business owner you could trust? In my opinion: No. Note: I did send a second installment right after I was asked to do so, but then I realized how irresponsible the owner was, and I realized I already paid too much for the work done properly, I cancelled it. BTW – Note for a lawyer: nowhere in the contact it says we have to pay 1/3 upfront (I did it because I usually trust people). Nowhere in the contract does it say that we have to pay a second installment - at this point I no longer trusted the owner. 

Here is my financial proposition:

I already paid 1/3 of the contract value ($4,715.43), this is $1571.81 (via Interact transfer).

Considering the points above:

One day of work done, and one day I have to pay to undo the work of the second day – we are even.

Fees to dispose of the old floor, as per your Quote QU-0437: $100.00

Material left in my house, you could send me a detailed list with costs if you wish, I can assess it at roughly $500.00.

And to make it simple, send me a refund of $1000.00 via Interac to my email address and the case is closed.

At this point I am waiving the loss of whatever could be considered by the law as other damages.

 

Sincerely,

Ma_Signature.gif

Serge F.

PROOF THAT MY PLAN WAS REALISTIC - I HIRED AN OTHER COMPANY TO RIP THE OLD SUBFLOOR - IT WAS NOT STRUCTURAL, WE TOOK IT OFF, SO IT ALLOWED US TO DO THE FIRST PHASE OF SOUNDPROOFING (AS PER SPECIFIED IN THE CONTRACT WITH ADVANTAGE FLOORING - JAY BEHL).